April 14, 2013
Had a pretty productive weekend. Pete was a great help and enabled us to get the rafters sorted, cut, sanded, stained and stockpiled for installation. We also placed the sleeping cabin’s ridge beam and prepped the deck support beams as well. Now the entire remaining lumberyard is known and organized. We had intentions of getting a paddle in but the air temperature at either ends of the day is a little chillier than usual so we chose the beer option instead.