June 4, 2013
It was a beautiful day on the west coast – probably the warmest air temperature so far this year. Spent the day with the plumbers, Matt and Dave, who were tying in the water lines, pressure tanks and pump systems. I was focused on the west wall envelope, getting the rainscreen set. At the end of the day I was privileged with the opportunity to get in an extra workout as the bales of insulation were shipped out on a concrete barge that was working in west bay. The bags were humped up the hill and then loaded on a trailer which Al helped to drive to the site. A couple of trips and we were done.