February 28, 2013
Ok. It’s on. Took up the starter run today with a rainfall warning in effect. Boat ride was ok but it was a bit slow unloading in the rain. It was also a 2 barge day – one was getting loaded in horshoe bay and another dropped off the excavator, truck, water tanks, septic system, propane tank, solar system and soil. We also started a fire to burn the remnants if the cabin demo (Tom did a good job of minimizing the waste). Early start tomorrow as we still have a lot to do to get ready for the next load.