March 10, 2013
It was a drain tile install day. With my trusty labourer, Dana, we managed to get both the main and sleeping cabins complete. We now need to get inspections from the Sunshine Coast Regional District (SCRD) before we can backfill and get going on the septic and rain water storage systems. It will be nice to get this done as we will be able to create more space on the site and organize the multitude of lumber packages scattered around the site. Steve and Mack came by for a visit – looking forward to them coming up for spring break!