Framing

March 12, 2013

Ok. Wild night out there blowing east and raining hard. Hunkered down inside and thankful to have a warm place to hang in. Nothing to get super excited about today but I feel good about finishing the gravelling of the drain tile and actually starting the framing process by laying out the plates of the main cabin. We had our first SCRD inspector out today to look at the drain tile and everything else done to date. All is ok to proceed and the next inspection will be framing and the last will be the final. Hoping tomorrow to start the septic system and soon have the dirt around the site leveled.