June 12, 2013
I know you have already seen the barge board movie but this is truly the last instalment. Both the main and sleeping cabins have two laps of these boards around their perimeters for a total of 412 feet. We had previously run out of materials and were reloaded with the barge arrival last Friday. Dana stained the boards on the weekend and today was the final lap on the sleeping cabin.