March 16, 2013
Another full day married to the excavator but we are close to final grades. The front and back are close and the thing that got me most excited was placing the original fireplace foundation concrete from the original panabode cabin (which had been saved previously) as the base for the deck stairs for the new cabin. We started moving lumber into position but a ferocious squall came through with a north west wind and we decided to call it a day.